top of page
Screenshot 2023-01-07 at 17.11.54.png

The Loneliest Boy in the World

Set build in Bay Studios 2021

This set was build in Bay Studios, Swansea in January/February of 2021. Construction budget was £30k, which included all wall coverings, carpets, windows and doors (bought second hand), tiling and the labour to install.

We had £25k for dressing the bathroom, living room, kitchen, two bedrooms and the hallway.

SketchUp floor plans by Junting Yang and renders by Greg Hewitt

Mum's bedroom LBTW_edited.jpg
Screenshot 2023-01-07 at 16.58_edited.jpg
Living room_ kitchen LBTW_edited.jpg
Screenshot 2024-02-09 at 11.14.43.png
Screenshot 2024-02-09 at 11.16.08.png
Screenshot 2024-02-09 at 11.17.55.png
Screenshot 2024-02-09 at 11.13.15.png
Screenshot 2024-02-09 at 11.14.06.png
Screenshot 2024-02-09 at 11.18.09.png
Screenshot 2024-02-09 at 11_edited.jpg
Screenshot 2024-02-09 at 11.45_edited.jp
Screenshot 2024-02-09 at 11.50.33.png
Screenshot 2024-02-08 at 13.57.16.png
Screenshot 2024-02-08 at 15.12.09.png
Screenshot 2024-02-08 at 15.15.01.png
Screenshot 2024-02-08 at 15.13.14.png
Screenshot 2024-02-09 at 11.07.08.png
bottom of page